Deck, 150, Stainless Steel, Left Hole for Centrifuge and Right Hole for Reader
Open Market/ 8 Weeks
Deck, 200, Stainless Steel, Right Hole for Reader
Open Market/ 8 Weeks
Microwave Terminating Power Standard, 10 MHz 50 GHz Transport Case Included
Open Market/ 30 Weeks
Frequency range: 1MHz to 6GHz, with vector modulation (not installable post factory, hardware option)
PN:[SGS-B106V]
Open Market/ 22 Weeks
Programmable Resistor Card. 4 Channels 8 Ohm to 512 KOhm, 8 Ohm Resolution
PN:[3B992]
Open Market/ 45 Days
Genesys - DC Power Supply: 10kW, 150V, 66A, 3U, Full-Rack, AC Input: Three-phase 208VAC, 400VAC, or 480VAC; CE Mark: 10kW/15kW (400VAC/480VAC), RS-232/RS-485 Interface (NON CANCELLABLE or RETURNABLE)
Open Market/ 6 Weeks
SMF 1310/1550/1625nm OTDR Module (UPC/OPM/LS).
Open Market/ 6 Weeks
Cary 5000 UV-Vis-NIR Bundle
Open Market/ 16 Weeks
Vortex-Genie 2, 120V (Model G560)
Open Market/ 364 Days
Orbital-Genie Shaker, Standard Flask Clamps, 120V
Open Market/ 364 Days
High pass filter, improved dynamic range for measurement of harmonics, suppression of fundamental signals from 500MHz to 1.5GHz (software license)
PN:[FSW-B13]
Open Market/ 22 Weeks
Extension to 40MHz signal analysis bandwidth, includes microwave preselector bypass (software license)
PN:[FSW-B40]
Open Market/ 22 Weeks
Genesys - DC Power Supply: 1500W, 80V, 19A, 1U, Full-Rack, AC Input: Single-phase 85-265VAC; AC Input Cable (USA): 2m, CE/UKCA Marks, Linking Cable (RS-485), RS-232/RS-485 Interface (NON CANCELLABLE or RETURNABLE)
Open Market/ 4 Weeks
Inline Peak Power Sensor, 350 MHz - 4 GHz (Includes 2000-1606-R Cable)
Open Market/ 6 Weeks
Genesys - DC Power Supply: 15kW, 80V, 187.5A, 3U, Full-Rack, AC Input: Three-phase 208VAC, 400VAC, or 480VAC; CE Mark: 10kW/15kW (400VAC/480VAC), RS-232/RS-485 Interface (NON CANCELLABLE or RETURNABLE)
Open Market/ 6 Weeks
Genesys - DC Power Supply: 15kW, 500V, 30A, 3U, Full-Rack, AC Input: Three-phase 208VAC, 400VAC, or 480VAC; CE Mark: 10kW/15kW (400VAC/480VAC), RS-232/RS-485 Interface (NON CANCELLABLE or RETURNABLE)
Open Market/ 6 Weeks
UVP GelStudio touch, 12MPX, 100-115V
Open Market/ 90 Days
SMF 1310/1550/1625nm uOTDR Module (UPC/OPM/LS)
Open Market/ 6 Weeks
UVP GelStudio PLUS, 12MPX, 100-115V, with Accessories
Open Market/ 90 Days
RF Power Standard, Feedthrough, 10 MHz-50 GHz
Open Market/ 30 Weeks
Infinite Base Unit, M1000 PRO, Premium Quad4 Monochromators, 1 yr warranty
Open Market/ 5 Weeks
Agilent 8900 for Advanced App
Open Market/ 16 Weeks
Agilent 8900 for Semicon Appl
Open Market/ 16 Weeks
c-lens configuration
Open Market/ 16 Weeks
Upgrade to Dry Pump
Open Market/ 16 Weeks
8697 Barcode Reader
Open Market/ 16 Weeks
8697 Headspace Sampler
Open Market/ 16 Weeks
Handheld spectrum analyzer 9kHz to 3.6GHz, with preamplifier and tracking generator
PN:[FSH4]
Open Market/ 22 Weeks
Handheld spectrum analyzer 9kHz to 8GHz, with preamplifier and tracking generator
PN:[FSH8]
Open Market/ 22 Weeks
HIGH VOLTAGE SMU - SINGLE CHANNEL
Open Market/ 12 Weeks
SYSTEM SOURCEMETER - DUAL CHANNEL 200V
Open Market/ 12 Weeks
RFC 6349 option for MU100010A - provides dual port TCP throughput testing up to 10G based on the RFC6349 standard. Up to 16 TCP sessions can be tested simultaneously as well as connectivity testing to iperf server by emulating iperf client.
Open Market/ 6 Weeks
Single channel Fibre Channel option for MU100010A - includes support for 8G and 10G FC; latency; BER; service disruption; line alarms and error monitoring
Open Market/ 6 Weeks
V Connector Calibration Kit
Open Market/ 6 Weeks
Genesys - DC Power Supply: 2400W, 60V, 40A, 1U, Full-Rack, AC Input: Single-phase 230VAC or Three-phase 208VAC; CE/UKCA Marks, Linking Cable (RS-485), RS-232/RS-485 Interface (NON CANCELLABLE or RETURNABLE)
Open Market/ 6 Weeks
Dual channel 10G Ethernet option for MU100010A - includes IPv4/IPv6; Y.1564; RFC 2544; BER; Multi-stream; OAM; SyncE; MPLS; MPLS-TP; Stacked VLAN; PBB-TE; Ping/Traceroute; Cable test
Open Market/ 6 Weeks
Single channel STM-64/OC-192 option for MU100010A - includes PDH/DSn testing; Bi-directional monitoring/mapping; Error/Alarm; Performance Delay/APS measurement; Header onitoring/generation; Pointer event generation; Trouble scan
Open Market/ 6 Weeks
H2 Cell Gas Line
Open Market/ 16 Weeks
s-lens configuration
Open Market/ 16 Weeks
H2 Cell Gas Line
Open Market/ 16 Weeks
MIZ-21C-ARRAY USAF Basic Kit NSN: 6635-01-675-8233 and SURFX Low Frequency Array Probe
Open Market/ 3 Weeks
MIZ-21C-ARRAY USAF Basic Kit NSN: 6635-01-675-8233 and SURFX Short Tape Array Probe
Open Market/ 3 Weeks
MIZ-21C-ARRAY USAF Basic Kit NSN: 6635-01-675-8233 and SURFX Long Tape Array Probe
Open Market/ 3 Weeks
Rf Amplifier, 25 W CW, 10 kHz - 1000 MHz
Open Market/ 6 Weeks
Rf Amplifier, 50 W CW, 10 kHz - 1000 MHz
Open Market/ 6 Weeks
Rf Amplifier,150 W CW, 10 kHz - 1000 MHz
Open Market/ 8 Weeks
TB5800-100G 1GE 10GE 100GE GAD Package - TAA
PN:[22123979]
Open Market/ 364 Days
TAA Compliant package for US Government - TB5800 OC192 10Ge Dual Port Package no Wifi or BT
PN:[22060905]
Open Market/ 364 Days
IRIG and GPS interface
Open Market/ 45 Days
Multi-unit synchronization interface
Open Market/ 45 Days